References · Reference

PPP Pipeline Status Reports as at December 2024, PPP Directorate, National Treasury, January 2025.

PPP Pipeline Status Reports as at December 2024, PPP Directorate, National Treasury, January 2025.

Contributed by Jay. Approved by Jay on 16 October 2026, from revision 309 of the article “Mombasa Electric Ferry and Water Transport System”.
Ask the Librarian